Your browser is unsupported and may have security vulnerabilities! Upgrade to a newer browser to experience this site in all it's glory.
Skip to main content

Latest News and Live Project Updates

28th July 2021

Find the latest news and updates on live projects we are currently working on across Commercial, Retail and Residential sectors.

One Causeway Park Min 1024X679

Project: One Causeway Park, Staines

System: Secret Fix Systems (SFS1) CWCT tested

Finish: Anodized Anolok

Size: 500m2

The One Causeway Park project is a new £40M office development in Egham, Staines, the building itself will be five-storeys in height and will cover an area of 120,000sq ft, consisting of a fair-faced concrete structure and soffits, aluminium and unitised cladding systems. This impressive modern working environment will be visible from the M25 and be a signature building for the area.

Brookfield Retail Park

Brookfield Retail Park Hertfordshire

Project: Brookfield Retail Park, Hertfordshire

System: Interlocking Plank System (IPS) CWCT tested.

System: Through Fix System (TFS1) CWCT tested

Finish: Polyester Powder coated

Size: 6000m2

North London’s premier out-of-town retail destination is undergoing a full façade and shopfront redevelopment. 6000m2 of Eltherington’s aluminium Plank and cassette systems will be powder coated in 4 different RAL colours and installed with our CWCT tested Hilti subframe.

Brunel Street Works

Brunel Street

Project: Brunel Street Works

System: Through Fix System (TFS1) CWCT tested

System: Castellated System (CS) CWCT tested

Finish: A1 pre painted aluminium RAL 7022

Size: 2000m2

One of the largest regeneration sites underway in London is

Brunel Street Works. Our Through Fix (TFS1) and Castellated (CS) systems were specified to add the finishing touches to these

striking buildings positioned adjacent to Canning Town station.

Hilti Desktop

All of our rainscreen systems are independently tested and accredited by CWCT using the Hilti Eurofox support system.

In partnership with Hilti we offer the complete system, from design, measure, brackets, fixings, mounting insulation, firestop, profiles & alignment to rainscreen cladding, as well as nationwide on-site support from the Hilti Building Envelope Specialists and Engineering team, we have every base covered.

The team at Eltherington are able to provide support to customers at all stages of the design and installation process. This is backed up by specialist teams from Hilti that can ensure outcomes are fully optimized on site.

Eltherington operates a 12-acre state-of-the-art manufacturing facility in Hull and is able to supply a wide range of standard and bespoke solutions for building facades, roofline, column casings, perforated panels and 3D castellated cladding.

All the company’s architectural metalwork solutions are manufactured at its new headquarters in Hull.

1305 Hedon Road 01482 320 336

Eltherington Group Website (eltherington.co.uk)