Top 3 Projects of Lockdown 2
14th December 2020
Top 3 Projects of Lockdown 2
Take a look at the projects we are undertaking in Lockdown 2
Top 3 Projects of Lockdown 2
Castlepoint Shopping Centre, Bournemouth
Kier were contracted to demolish and rebuild the car park and associated walkways at Castlepoint shopping centre in Bournemouth.
Eltherington Architectural will design and manufacture 2000m2 of curved fascia and over 1000 no bespoke column casings using 3mm aluminium powder coated RAL 9010.
Our column casing spec guide is available here
One Causeway Park, Staines
AimCo, a leader in the business space sector, has appointed BAM Construction to deliver the first phase of its exciting new masterplan.
The highly modern, circa £40 million development has an attractive curved design by architect ARUP.
The five-storey Grade A building features a fair-faced concrete structure and soffits, circular columns and the Eltherington (SFS1) Secret Fix cladding system in 3mm anodised aluminium.
Our SFS1 rainscreen system spec guides are available here
Docklands Hotel, London
Located in close proximity to London City Airport and the ExCel Conference & Exhibition Centre, the new Docklands Hotel will have a striking and contemporary façade that pays homage to the sites maritime history.
10,000 m² of Eltherington Coreclad A1 range in Corten finish was specified for its A1 fire rating and the high tech paint finish that gives the appearance of weathered steel.
Coreclad brochure available here